Both parks close most of their roads to cars for winter and open them again in stages each spring, on dates they set ahead and move with the snow. In Grand Teton the highway through the valley stays open all year, and the Teton Park Road, the inner road past Jenny Lake, opens to cars on 1 May. In Yellowstone, by the park’s projected dates, the first roads open to cars on 16 April 2027 and the South Entrance, the way in from Jackson, on 14 May. Here is every date for 2027, the construction closures Grand Teton plans for the spring, and what you can still drive in winter.
The 2027 dates at a glance
| Road | Open to cars in 2027 |
|---|---|
| Grand Teton: US-89/191 and US-26/287, Jackson to Flagg Ranch | All year, plowed all winter |
| Yellowstone: North Entrance to Northeast Entrance, Gardiner to Cooke City, Montana | All year |
| Yellowstone: West Entrance to Madison, Madison to Old Faithful, Madison to Norris, Mammoth Hot Springs to Norris, Norris to Canyon Village | 16 April to 31 October |
| Grand Teton: the Teton Park Road, Taggart Lake Trailhead to Signal Mountain Lodge | 1 May, depending on the weather, to 31 October |
| Yellowstone: East Entrance to Fishing Bridge (Sylvan Pass), Canyon Village to Bridge Bay | 7 May to 31 October |
| Yellowstone: South Entrance to West Thumb, West Thumb to Old Faithful (Craig Pass), West Thumb to Lake Village, Tower-Roosevelt to Tower Fall | 14 May to 31 October |
| Grand Teton: the Moose-Wilson Road, Death Canyon Road to Granite Canyon Trailhead | From about mid-May, by conditions |
| Yellowstone: Canyon Village to Tower Fall (Dunraven Pass) | 28 May to 11 October, or later if conditions allow |
| Beartooth Highway (US-212), outside Yellowstone’s Northeast Entrance | 28 May to 11 October |
| Grand Teton: the Moose-Wilson Road, Laurance S. Rockefeller Preserve to Moose | Closed for construction 1 May to 19 June, on the park’s anticipated schedule |
Yellowstone’s dates are the park’s projections, and its roads typically open at 8:00 a.m. on the first day. Grand Teton’s construction dates are its anticipated schedule. Each is set out below with where it comes from, and where the parks’ own pages disagree, both are printed.
Grand Teton
Grand Teton closes roads in winter for the two reasons it gives: to keep them for skiing, snowshoeing and walking, and to leave corridors for wildlife. Two roads close on a fixed schedule, the Teton Park Road and the Moose-Wilson Road; the rest close by conditions.
The highway: open all winter
The highways through the valley, US-89/191 and US-26/287, are plowed and open all winter from the town of Jackson to Flagg Ranch, just south of Yellowstone, and in winter they are the way to see the park from a car, with the range in view and wildlife along the road. The park asks winter drivers for winter or all-season tires, chains for the mountain passes and a winter safety kit in the car, and warns that its roads are often snow-covered and icy.
The Teton Park Road
The Teton Park Road is the park’s inner road, along the foot of the range from Moose past Jenny Lake to Signal Mountain. Every year the park closes 14 miles of it to cars, from 1 November to 30 April, between the Taggart Lake Trailhead and Signal Mountain Lodge. It opens again in May: in the park’s words, “The 14-mile section of the road opens to motor vehicle traffic on May 1, depending on weather conditions.” In 2027 that is Saturday 1 May.
Jenny Lake and String Lake lie on the closed stretch, so they are reached by car only from 1 May. Before then the road belongs to people under their own power:
- From 1 November until snow covers it, it is open to bikes, runners, skaters and walkers, and to dogs.
- Once snow covers it, bikes of every kind, fat-tire and snow bikes included, and roller blades are not allowed. From mid-December to mid-March the park grooms it for skiing, snowshoeing and walking, and leashed dogs may use the multi-use lane.
- From early April to 30 April, once the snow melts, it is open to pedestrian travel only: walking, running, cycling, roller skating and skateboarding. From the Taggart Lake Trailhead, Jenny Lake is 8.4 miles there and back and Signal Mountain 14 miles one way, with no food or water along the road.
The park’s alert on these closures, “Winter Seasonal Road Closures”, is dated 1 November 2026 to 31 March 2027; its roads page, updated on 9 October 2026, is the newer of the two, and it keeps the road closed to cars to 30 April. The park’s spring page gave the Cottonwood Creek Picnic Area as a loading zone for the closed road, but its alert of 16 November 2026, running to 31 March 2027, has that picnic area closed for construction and asks over-snow visitors to park and drop off at the Taggart Lake Trailhead.
Once the road opens, the 2027 construction meets it at Moose: on the park’s anticipated schedule, a new roundabout just north of the Moose Entrance Station brings 20-minute delays from 1 May to 15 November 2027, on top of any wait at the entrance station. More on the lake itself is on Jenny Lake.
The Moose-Wilson Road
The park’s pages give the Moose-Wilson Road’s opening three ways, and they fit together once you see that they speak of different ends of the road:
- Its roads page, last updated on 9 October 2026: “The Moose-Wilson Road is closed November 1 until mid-May based on conditions and unplowed from Death Canyon Road to Granite Canyon Trailhead.” That stretch is open to skiing, snowshoeing and hiking while it is closed to cars.
- Its spring page, last updated on 10 April 2026: “Open to vehicles once free of snow. Motorists may expect brief delays.”
- Its construction page, updated on 2 November 2026 and the newest of the three, for 2027: closed between the Laurance S. Rockefeller Preserve and Moose from 1 May to 19 June, on the park’s anticipated schedule.
So in 2027 the stretch closed for winter, from the Granite Canyon Trailhead north to Death Canyon Road, opens to cars about mid-May, when the snow allows, while from the preserve north to Moose the road stays shut for construction to 19 June. Until then the preserve is reached by car only from the south, by Teton Village and Granite Canyon, and on that schedule the road cannot be driven end to end until after 19 June 2027.
At the north end this winter, the park’s own lists disagreed on 17 November 2026. Its construction page lists, among the major impacts of winter 2026–2027 once work stops on 15 November, the Moose-Wilson Road at Death Canyon Junction open, with reduced parking for over-snow recreation. The same page’s list of November’s disruptions, and the current conditions page (last updated 3 November 2026), still had the road between the preserve and Moose closed to all use. The park’s road status map, edited more recently than either page, showed the road from Moose to Death Canyon Junction closed to cars that day. The drive itself, its vehicle limits and the preserve are on our Moose-Wilson Road page.
Grassy Lake Road and the secondary roads
North of the park, in the John D. Rockefeller, Jr. Memorial Parkway, the Grassy Lake Road west of Flagg Ranch closes by conditions and is not plowed in winter. Once the park judges the snow deep enough, it opens to oversnow use: snowmobiles, skiing, snowshoeing and hiking. When Yellowstone’s winter season ends, generally on 15 March, the park closes the road west of Flagg Ranch to every motor vehicle, snowmobiles included, to protect grizzly bear habitat, through 31 May or later as posted while snow remains; its campsites are reached once the road opens in mid-June.
The other secondary roads, Antelope Flats, Deadmans Bar, Pilgrim Creek, Schwabacher and Two Ocean, close for the season by conditions, on no fixed date, and open as the snow allows. Antelope Flats Road is the way to the barns on Mormon Row; the road to Schwabacher Landing, and when it is open to cars, is on Schwabacher Landing and Oxbow Bend.
Grand Teton’s 2027 construction
Grand Teton is improving its roads, trails and visitor facilities ahead of its centennial in 2029, and work is planned across the park in 2027. It stops for winter from 15 November 2026 to 1 May 2027. The park’s construction page, updated on 2 November 2026, gives this anticipated schedule for 2027:
| Where | 2027, anticipated |
|---|---|
| Moose-Wilson Road between the Laurance S. Rockefeller Preserve and Moose | Closed, 1 May to 19 June |
| Death Canyon Road and Trailhead | Closed to all use, 1 May to 19 June |
| Teton Park Road at the new roundabout, Moose | Delays of 20 minutes, 1 May to 15 November, not counting the wait at the entrance station |
The park adds that project timelines and impacts are subject to change, and that turnouts, viewpoints and overlooks near a project may be harder to reach while it is built.
- Moose-Wilson Road Phase II, May 2026 to June 2027, moves the road north of Sawmill Ponds to meet the new roundabout, and parts of the road close so that equipment and materials can reach Death Canyon Road.
- The Death Canyon Trailhead, May 2026 to June 2027, moves about a mile, to a new trailhead with restrooms and about 90 paved parking spaces at the end of a paved Death Canyon Road a mile shorter than before, so hikes into Death Canyon get longer. While it is closed, Phelps Lake and Death Canyon are reached from other trailheads, among them Granite Canyon and Jackson Hole Mountain Resort, and the park expects parking at the Rockefeller Preserve to be limited, with long waits.
- The Teton Park Road Roundabout, May 2026 to November 2027, sits at the junction of the Teton Park Road and Menor’s Ferry Road, just north of the Moose Entrance Station. Once it is built, traffic heading north off the Moose-Wilson Road joins the Teton Park Road there without passing through another entrance station.
This winter, the park lists three areas closed or changed while the work is paused: the Moose-Wilson Road at Death Canyon Junction open, with reduced parking for over-snow recreation; the Cottonwood Creek Picnic Area closed to all use; and the Windy Point Turnout closed to all use. On 17 November 2026 its construction and current conditions pages also listed 20-minute delays in both directions on US-26/89/191 just south of Moran Junction, where crews were stabilizing the roadbed beside the Snake River, with one lane open at a time under a temporary signal. The park gave that project a timeframe of October to December 2026, and its alert for the delays was dated 28 September to 30 November 2026.
Yellowstone
In Yellowstone one road is open to cars all year, from the North Entrance at Gardiner, Montana, through the park by Tower Junction to Cooke City, Montana. Every other road closes to cars by the start of November, and Dunraven Pass after 11 October, on the park’s projected dates. Most of them open to oversnow travel only, from mid-December to mid-March, once the snow is deep enough, and then to cars again in stages from mid-April. When a road is open it is not gated at night, and you may enter or leave the park at any hour.
The park prints its dates under a section heading that still reads “2026 Road Opening & Closing Dates (Projected)”. The dates themselves sit under two subsections, “2026–2027 Oversnow Vehicle (Snowmobile & Snowcoach) Travel Dates” and “2027 Regular Vehicle Travel Dates”, which is where the years below come from, and every one is a projection: “Roads typically open at 8:00 a.m. on the first day. All dates are subject to change depending on weather conditions.” The roads page carrying them was last updated on 12 November 2026.
Winter 2026–2027: oversnow travel only
Since 1 November 2026 the park’s alert has had most of its roads closed to all vehicles while they are made ready for winter, a season that, in its words, “will begin December 15 (weather depending)”. Oversnow travel means a guided snowmobile or snowcoach, or the park’s Non-Commercially Guided Snowmobile Access Program, which lets in up to four non-commercially guided groups a day, one at each oversnow entrance, on permits drawn by lottery.
| Road | Open to oversnow travel |
|---|---|
| North Entrance to Northeast Entrance | All year, and to cars |
| Mammoth Hot Springs to Norris | 15 December 2026 to 7 March 2027 |
| Norris to Madison, Norris to Canyon Village, Canyon Village to Washburn Hot Springs Overlook | 15 December 2026 to 9 March 2027 |
| Canyon Village to Fishing Bridge | 15 December 2026 to 14 March 2027 |
| The West, South and East entrances, and every other groomed road | 15 December 2026 to 15 March 2027 |
From Jackson, the plowed highway ends at Flagg Ranch, just south of Yellowstone, and the South Entrance road is open from 15 December to 15 March to oversnow travel alone. The guided winter trips from Jackson are on Jackson Hole in winter without skiing.
2027: when each road opens to cars
| Opens to cars | Closes | Roads |
|---|---|---|
| All year | Does not close | North Entrance to Northeast Entrance |
| 16 April 2027 | 31 October | West Entrance to Madison, Madison to Old Faithful, Madison to Norris, Mammoth Hot Springs to Norris, Norris to Canyon Village |
| 7 May 2027 | 31 October | East Entrance to Fishing Bridge (Sylvan Pass), Canyon Village to Bridge Bay |
| 14 May 2027 | 31 October | South Entrance to West Thumb, West Thumb to Old Faithful (Craig Pass), West Thumb to Lake Village, Tower-Roosevelt to Tower Fall |
| 28 May 2027 | 11 October, or later | Canyon Village to Tower Fall (Dunraven Pass) |
From Jackson, 14 May is the date that matters: the South Entrance road and the road over Craig Pass to Old Faithful open to cars together. Before it, Old Faithful by car means the West Entrance, projected open from 16 April, and the long way around through Idaho; the route and its miles are on Jackson to Yellowstone. Dunraven Pass, between Canyon Village and Tower Fall, is a high pass that generally gets more winter weather than the park’s other roads, and it is the last to open; the park says it could stay open past 11 October if conditions allow.
The spring gap is the thing to plan around. On the projected dates, from 16 March to 15 April 2027 every road in Yellowstone but the northern one is closed to oversnow travel and to cars alike, and the South Entrance road stays closed to both until 14 May.
Outside the Northeast Entrance
The Beartooth Highway (US-212), from Cooke City to Red Lodge, Montana, is projected open from 28 May to 11 October 2027. That first day is the Friday of Memorial Day weekend, when the park says the highway typically opens. The park’s table gives the Chief Joseph Scenic Byway (WY-296) the same dates, while its section on the roads outside the entrance says the byway is open all year from WY-120 to the Pilot Creek parking lot, and that its 9 miles from Cooke City to Pilot Creek are open to wheeled vehicles from mid-May to early November. Both statements are on the same page, updated 12 November 2026; after either road’s first opening, weather closes them from time to time.
Road work in Yellowstone in 2027
Yellowstone chip-seals roads every year, and in 2027 it expects delays of up to 30 minutes at places across the park while crews work through the year. On chip seal it asks drivers to slow down and keep to the recommended speed, because loose gravel can damage cars and windshields.
In 2026 the park scheduled the Gardner River High Bridge, half a mile southeast of Mammoth Hot Springs toward Tower Junction, to run one lane at a time with delays of up to 15 minutes, day and night, through 24 November 2026: from 13 April by the park’s roads page and from 1 April by its alert.
What is open in winter
Grand Teton is open all winter. The park is open 24 hours a day, every day of the year. What closes is inside it: from November through April some roads, all campgrounds and most visitor facilities are closed or keep reduced hours. The highways from Jackson to Flagg Ranch are plowed, the closed stretches of the Teton Park Road and the Moose-Wilson Road are open to skiing, snowshoeing and walking, and the Grassy Lake Road opens to snowmobiles once the snow is deep enough. On 17 November 2026 the park’s season table, last updated on 10 September 2026, still gave 2026’s opening dates for its visitor centers, campgrounds and lodges. The campgrounds’ 2026 dates are on Grand Teton camping, and what each month brings on the best time to visit Grand Teton.
Yellowstone is closed to cars in winter except on its northern road, from Gardiner to Cooke City. From 15 December 2026 to mid-March 2027 its groomed roads are open to guided snowmobiles and snowcoaches and the lottery permit groups, on the projected dates above.
Checking a road on the day
Both parks warn that their road maps can miss a short closure or delay.
- Grand Teton keeps a road status map on its roads page, and warns that updates to it may be delayed and that short closures and delays may not show. For the highways, Wyoming’s Department of Transportation posts road conditions at wyoroad.info and answers on 511 from a cell phone.
- Yellowstone keeps a live map on its roads page, and recorded road information on (307) 344–2117. Texting 82190 to 888–777 signs a phone up for its road alerts.
If your dates are in April or May
A trip in the spring gap is still a good one, if it is planned around the roads: Grand Teton’s highways are open, the Teton Park Road is open to walkers and cyclists in April and to cars from 1 May, and Yellowstone projects its west side open to cars from 16 April. Which Yellowstone tours from Jackson sell dates before the South Entrance opens is on Yellowstone tours from Jackson Hole. What to book for the summer, and how far ahead, is on Grand Teton in summer 2027.
